How MCIM Enhances Every Stage of Data Center Commissioning

May 5, 2025
How MCIM Enhances Every Stage of Data Center Commissioning

Building a high-performance data center starts with quality control at every phase of data center commissioning.

A recent whitepaper, “The Seven Stages of Data Center Commissioning Explained” by JLL, highlights how critical it is to embed commissioning teams early and maintain rigorous oversight throughout design, installation, testing, and handover.

But commissioning doesn’t end with ribbon cutting. For long-term operational success, facilities need a way to digitize and operationalize the knowledge, tests, and documentation developed during commissioning. That’s where MCIM makes a critical difference.

Connecting Data Center Commissioning to Ongoing Operations with MCIM 

MCIM strengthens and streamlines every level of commissioning, ensuring that investments made during pre-occupancy commissioning translate directly into better asset management, operational reliability, and risk mitigation over the life of the facility.

Here’s how MCIM supports each stage outlined in the whitepaper:

Commissioning StageKey ActivitiesMCIM Enhancement
Level 0: Programming and DesignDocument owner requirements, review designsAsset Management captures specs and creates system of record
Level 1: Factory AcceptanceQA/QC inspections and witness testingDocumentation stored and linked to equipment profiles
Level 2: Site Acceptance TestingInspect, verify, and test delivered equipmentRounds and Incident Management track findings and static test results
Level 3: Start-Up and Pre-FunctionalConfirm basic equipment functionalityWork Management with intelligent CMMS digitizes checklists and start-up forms
Level 4: Functional Performance TestingValidate equipment performance to sequence of operationsTesting procedures, results, and issue resolutions logged
Level 5: Integrated Systems TestingTest system integration and redundancy under loadFull testing data captured; load bank and “pull-the-plug” scenarios tracked
Level 6: Transition to OperationsHandoff of documentation and training to operations teamSeamless transition into live operational modules: Asset Management, Monitoring, Capital Planning

Why It Matters

Too often, the knowledge gained during data center commissioning is trapped in binders, disconnected spreadsheets, or lost during team transitions.

MCIM ensures:

  • Commissioning data lives on as operational intelligence.
  • Facility teams have immediate access to asset histories, warranty information, and critical testing documentation.
  • Issues identified during commissioning are fully resolved, documented, and referenced for ongoing reliability benchmarking.
  • Capital planning is informed by real-world asset performance from day one.

Commissioning is not just a project milestone — it’s the foundation of operational excellence.

By pairing a strong commissioning process like the one outlined in the “Seven Stages of Data Center Commissioning” with a robust digital platform like MCIM, owners can protect their investment, reduce operational risk, and ensure resilient performance for years to come.

Click here to learn more about how MCIM can transform your commissioning process and ongoing operations or reach out to speak with an expert.

More Resources

Escalating Thermal Loads
As AI and HPC drive thermal loads to new heights, learn how MCIM helps data centers manage cooling risk and
field service management software needs to be built for compliance
Optimize mission-critical operations with compliance-focused field service management software. Enhance safety, efficiency, and asset utilization today.
Overcome Data Center Power Constraints
Discover how data center leaders are tackling power constraints in 2025. Forecast demand, optimize energy use, and ensure operational resilience